In the picture below I need to transition from copper to pex (top right side of the picture) and the feed the vanity the shower column and the smart toilet.
At a first sight, besides the two transition couplings, I would say I just need three Tees that the rest of them (1,2,3,4) could be bends with adequate support. The copper is 1/2 so I will transition to the same unless I am being told to use larger. Main supply is above, in the ceiling, that is where the to copper veriticals at the top...
Is it advisable and possible to run for this PEX layout, without using elbows (i.e. just bends)?
No comments:
Post a Comment