Hey guys
Had a contractor sub out his plumber to install a new sewer line from the front of the house to the back of my house. I’m trying to verify it was done correctly I hired a second plumbing company to come camera the line.
The new sewer line is 3” ABS and spans about 60 feet. There is a section halfway through that has a tiny belly where water sits no higher than a 1/4”.
My question is this. Will this be a problem or is this relatively minor and just continue on?
No comments:
Post a Comment